Total station marking work
During the construction process for new RC buildings, sleeves (holes for passing piping through) and inserts (screws for hanging piping and air conditioning equipment) are installed.
The long-standing method was to look at drawings on-site and follow the dimensions, with two people working on the job. Our method processes the digital drawings, uploads them to a tablet, and uses a prism to determine the exact position. This allows one person to work alone, and is 3 to 4 times more efficient than traditional methods.
In addition, complex marking out is also possible.
*We can also create construction drawings for sleeves and inserts.
*We also install inserts and sleeves.
